Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the nfd_wpnavbar_setting handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home3/mommyra1/public_html/wp-includes/functions.php on line 6078

Warning: Cannot modify header information - headers already sent by (output started at /home3/mommyra1/public_html/wp-includes/functions.php:6078) in /home3/mommyra1/public_html/wp-includes/feed-rss2.php on line 8
Contractor – Mommy Ramblings https://www.mommyramblings.org For Families Living The Dream & Everything In Between Thu, 11 Jun 2015 01:49:28 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.2 30009848 Master Bath Renovation Update-The Walls Are Going UP!!! #CurbAppeal https://www.mommyramblings.org/2014/03/31/master-bath-renovation-update-walls-going-curbappeal/ https://www.mommyramblings.org/2014/03/31/master-bath-renovation-update-walls-going-curbappeal/#respond Tue, 01 Apr 2014 02:13:49 +0000 http://www.mommyramblings.org/?p=18456 Continue reading ]]> Very noisy and busy day in our household today.  The tile contractor finished the rest of the tile demo and started tiling the area that will be around the whirlpool tub.  Things are taking shape, of course we have a huge amount of work left but for the first time we are seeing the start of our new bathroom.

tile phase 2

These are 2 of the walls that will be around the tub.

tile phase 2 5

This picture shows the two walls in the picture above plus the third wall that is tiled to the ceiling since it is attached to the other floor to ceiling wall where the shower will be.
You can also see the niche that was tiled with the mosaic accents in the back of it.

A little better view of the niches by the whirlpool.

A little better view of the niches by the whirlpool.

With the walls demoed we were able to try the Concealed Cabinets for placement.  The cabinets are being installed in the walls on the side of the master vanity.  They will look a picture and hide a large medicine cabinet.  The walls will be tiled around the cabinets.  Above  each sink will be a large mirror and then we have new lighting that will be installed above the mirrors along with all the recessed lighting already installed.

Now that the walls are all demoed we are trying to figure the placement for the 2 Concealed Cabinets.

Now that the walls are all demoed we are trying to figure the placement for the 2 Concealed Cabinets.

Seem to fit how the studs are perfectly without any major changes.

Seem to fit how the studs are perfectly without any major changes.

I am sure there will be more updates tomorrow along with more noise but it is noise with a purpose.

 


]]> https://www.mommyramblings.org/2014/03/31/master-bath-renovation-update-walls-going-curbappeal/feed/ 0 18456